Featuring an outdoor pool and spa, the High Point University project began in October 2023.
• Pool: 1,728 sq ft surface area, holds 44,431 gallons of water
• Spa: 186 sq ft surface area, hold 3,404 gallons of water 5 similar pools/spas built by Paddock Construction on this campus